Cortizo Windows is a specialist network for aluminium and PVC windows for homes, with professional advice, an energy-saving calculator, quote request forms and a store locator.

Practical Ventanas Cortizo guide

How to measure windows for a quote

Measurements, photos and details to prepare before requesting a window replacement quote.

In this guide
  1. Direct answer: approximate measurements are enough for a first quote
  2. What to measure
  3. Useful photos
  4. Items that change the price
  5. Common mistakes
  6. Practical recommendation
  7. Define the problem before choosing
  8. Plan the work and its full scope
  9. Assess the window as a complete system
  10. Opening method, gaskets and hardware
  11. Performance data and glazing
  12. Installation preserves performance in the building
  13. Large openings and terrace doors
  14. What the proposal should specify
  15. Common mistakes to avoid
  16. Final checklist

Direct answer: approximate measurements are enough for a first quote

For an initial quote, you do not need millimetre precision. Measure the visible opening, take clear photos and explain whether the job includes only the window, a shutter, a shutter box, mosquito screen or interior trims.

Final dimensions must always be checked by a professional before manufacturing or installation.

What to measure

Measure width and height in several points. Differences may reveal an uneven opening that needs careful finishing.

Also note opening type, shutter box, nearby radiators and any space limitations.

Useful photos

Send front photos, side details, the shutter box and the exterior when possible. These images help evaluate access, finishing and possible thermal bridges.

Items that change the price

Removal, shutter replacement, acoustic glass, security hardware, exterior access and masonry finishing can change the final cost significantly.

Common mistakes

Measuring only the glass.

Forgetting the shutter box.

Sending no side or exterior photos.

Confusing width and height.

Manufacturing without a final technical check.

Practical recommendation

Prepare a simple table with room, width, height, main problem and photos. This makes the quote more useful.

Define the problem before choosing

A technical proposal is more useful when it starts with what is currently happening at each opening. It is important to distinguish between draughts, cold internal surfaces, excessive solar gain, noise, condensation, difficult operation, water ingress and insufficient safety. Several problems may occur at the same time and they do not always have the same cause.

It also helps to record when the problem appears, which room is affected, the orientation and the weather conditions at the time. This information makes it easier to prioritise the work and avoids choosing a window only because of its material, one isolated figure or a generic sales description.

  • Main problem and secondary problems.
  • Rooms and times when the issue is noticed.
  • Orientation, exposure and existing shade.
  • Opening type and condition of the current window.
  • Shutters, boxes, vents and other parts of the opening.
  • Comfort, energy, acoustic, safety and usability objectives.

Plan the work and its full scope

Cost and complexity depend on much more than the window itself. Removal, access, transport, building work, shutters, finishing, decoration, lifting equipment and waste handling can significantly change a proposal.

Where grants or a wider renovation are involved, review eligibility, dates, documents, compatibility between measures and responsibility for each procedure. Work should not start on the assumption that support has been awarded when no applicable decision has yet been issued.

  • Number, size and accessibility of the openings.
  • Partial or complete removal.
  • Building and finishing work.
  • Shutters, motors, electrical work and solar protection.
  • Access equipment, transport and storage.
  • Technical documents, invoices and evidence.
  • Coordination with façade insulation or other works.

Assess the window as a complete system

The result does not depend on one component. Frame, sash, glazing, gaskets, hardware, shutter, shutter box and the joint with the wall must work together. Advanced glazing can lose much of its benefit when there are air leaks, uneven closing pressure or an incomplete perimeter seal.

When comparing proposals, keep the dimensions, opening method, sash layout and glazing composition equivalent. Only then is it possible to understand whether a difference really comes from the window system or from a different scope of work.

  • Frame and sash profile geometry.
  • Full glazing composition.
  • Gaskets and closing pressure.
  • Hardware, hinges, rollers and keeps.
  • Shutter, box, guides and operating system.
  • Fixings, insulation, sealing layers and finishes.

Opening method, gaskets and hardware

The opening method affects airtightness, ventilation, clear passage, cleaning and the space used by the sash. Casement and tilt-and-turn windows generally compress perimeter gaskets, while sliding windows use different tracks, meeting stiles and locking systems. Fixed panes remove moving joints but require another solution for ventilation and cleaning.

Dimensions and weight must be compatible with hinges, stays, rollers and locking points. An oversized sash may lose adjustment, rub or require excessive operating force. Performance should be checked for the specific mechanism rather than for a generic opening category.

  • Space available for sash movement.
  • Compression and continuity of the gaskets.
  • Number and distribution of locking points.
  • Maximum weight supported by the hardware.
  • Handle height and ease of operation.
  • Safe access for cleaning the outside face.
  • Compatibility with shutters, insect screens and solar protection.

Performance data and glazing

Technical figures should correspond to the actual configuration and to clearly identified dimensions. Ug describes the centre of the glazing, Uf refers to the frame and sash profiles, and Uw represents the complete window. In acoustics, a value for the glass alone is not necessarily the performance of the complete window.

Glazing can combine low-emissivity coatings, solar control, asymmetric pane thicknesses, laminated glass, acoustic interlayers, warm-edge spacers and gas-filled cavities. The composition should respond to climate, orientation, noise, safety and opening size, rather than simply to the number of panes.

  • Thickness and purpose of every pane.
  • Cavity widths and the gas used.
  • Low-emissivity coating and solar factor.
  • Visible light transmission.
  • Acoustic or safety laminates.
  • Spacer and edge-of-glass performance.
  • Total weight and compatibility with profiles and hardware.

Installation preserves performance in the building

The window must be properly supported, level, plumb and fixed to a sound substrate. Perimeter insulation can fill and insulate the joint, but it does not replace structural fixings or the layers needed to control air and rain. A cover trim hides the joint; it does not close an open gap by itself.

In refurbishment, the project must decide whether the old frame is removed completely or partly retained. Keeping it can reduce disruption, but it can also reduce the visible glass area or preserve distortion, moisture, leakage and thermal bridges. Jambs, head, sill, weathering details and thresholds should be reviewed together with the window.

  • Condition of the wall, subframe and old frame.
  • Number, position and type of fixings.
  • Supports and setting blocks suitable for the weight.
  • Continuous perimeter insulation.
  • Internal air-control layer.
  • External protection against rain and weathering.
  • Drainage, sills, thresholds and finishes.

Large openings and terrace doors

As the glazed area increases, so do weight, wind loading and the demands placed on profiles, hardware, supports and transport. The maximum catalogue size is not always the most comfortable option for everyday use.

Sliding, lift-and-slide and slim-profile systems require continuous support, accurately aligned tracks, drainage, threshold detailing and waterproofing. Combining fixed panes with moving sashes can improve operation and reduce the number of moving joints.

  • Glass weight and thickness.
  • Stiffness under wind load and acceptable deflection.
  • Capacity of rollers, hinges and locks.
  • Operating force and entrapment risk.
  • Threshold, clear passage, accessibility and drainage.
  • Future transport, replacement, maintenance and cleaning.

What the proposal should specify

A useful quotation identifies every opening and explains the complete scope. Terms such as ‘double glazing’, ‘installation included’ or ‘acoustic window’ are not enough for comparison unless the composition, opening, removal, sealing and finishing work are described.

Initial dimensions and photographs are useful for a first assessment. Manufacturing dimensions should come from a final technical survey after the substrate, allowances, opening method, shutters, access and possible building work have been checked.

  • Reference, room, dimensions and orientation of each opening.
  • System, opening method, handing and sash layout.
  • Full glazing composition and available performance data.
  • Hardware, handles, shutters, boxes and accessories.
  • Retention or removal of the old frame.
  • Fixings, internal air seal and external weather protection.
  • Finishes, building work, decoration, access equipment and waste.
  • Included and excluded work.

Common mistakes to avoid

Many poor decisions result from comparing isolated components or leaving installation undefined. A favourable figure may be unrepresentative when it relates to another size, different glazing or only one part of the window.

Absolute expectations should also be avoided. Replacing windows can substantially improve comfort, but the final result is still related to the façade, roof, ventilation, building services and the way the home is used.

  • Choosing only by material, chamber count or polyamide depth.
  • Comparing quotations with different glazing and openings.
  • Using the same glass composition on every orientation.
  • Ignoring the shutter box and ventilation grilles.
  • Retaining an old frame without inspecting it.
  • Covering the perimeter without sealing the depth of the joint.
  • Making sashes too large for comfortable daily use.
  • Failing to define cleaning, ventilation, safety and maintenance.

Final checklist

Before accepting a proposal, check that the solution addresses the original problem and that every document describes the same configuration. A simple checklist helps reveal differences in scope before manufacturing begins.

  • Has the main need for each opening been identified?
  • Are dimensions and sash layout clear?
  • Is the glazing described in full?
  • Do the performance figures apply to that size and opening?
  • Have orientation, noise, humidity and exposure been reviewed?
  • Are the shutter and shutter box included in the assessment?
  • Is the removal and fixing method explained?
  • Are seals, sills, thresholds and finishes specified?
  • Is the opening comfortable and safe for its users?
  • Do the quotations being compared genuinely cover the same work?

Want to apply this guide to your home?

Prepare measurements, photos and priorities. A Ventanas Cortizo showroom can help define the right solution.

Request a quoteBack to advice